Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
—— Mr. David Chambers
—— Neil Renato
—— Fermin Lee
—— Dalius Skinulis
—— Sun Chull Kim
—— Sabinian Smith
—— Robbin
Introduction Two-Box Hot and Cold Thermal Shock Chamber
a. There are only two zones, the high temperature zone and the low temperature zone, and no test zone. Its "test zone" is a hanging basket, which is loaded with test samples and moves between the high temperature zone and the low temperature zone.
The conversion time is only 10 seconds. It can better simulate the instantaneous temperature conversion shock.
b. After the hanging basket is converted to a temperature zone, the hanging basket carries the energy of another temperature zone before the conversion. Therefore, the control system will start heating or cooling to increase the heat or cold supplement to stabilize the temperature.
c. When both zones have stored energy and the door is closed. Theoretically, the two-box hot and cold shock box cannot be used for normal temperature shock. But there is also a workaround, that is, the door of the temperature zone where the hanging basket is located is opened manually, and then the controller sets the timing according to the standard to complete the normal temperature shock.
Factory Address:No. 88 Jiaolian Yiheng Rd, Wanjiang District, Dongguan, China, 523046 | |
Sales office:Room 301, Building No.1, No. 2 Jiaolian Yiheng Rd, Wanjiang District, Dongguan, China, 523046 | |
+86--13711988687 | |
sales@iqualitrol.com | |